Lower East wall has been poured between the main footings, and the
forms have been removed.
Forms have also been removed from the adjacent footing to the North
(to the right in this photo).
Corresponding headway is seen on the South side (to the left).
Also on the South, forms for the next higher level of the wall are
being erected.
.