Forms for the foundation of the platform are taking shape above the place where the steps were previously located.
.
Forms for the foundation of the platform are taking shape directly under the portico roof (in place of the front steps that were removed earlier).
Drainage piping (center, upright, with orange caps) and electrical feeds (near worker behind drainage pipe) are being readied.
The platform will extend toward the East of the temple entry doors (toward the left in this photo). Two new sets of stairs will lead down
to the North (toward the foreground) and to the South, from the platform to the exterior walkway level.
.