Roof
truss hangers seen through windows.
-
Segment
of North wall erected (28 May 1999).
-
Central
roof trusses (29 May 1999).
-
Roof
parapets above the roof line (1 June 1999).
-
Central
tower and spire (5 June 1999).
-
Blue
air barrier is installed (6 June 1999).
-
Portico
erected at East entrance (12 June 1999).
-
Air
barrier on all of West side (15 June 1999).
-
Insulation
panels are set (23 June 1999).
-
Fence
posts along West side (1 July 1999).
-
Corbelling
on North and West walls (5 July 1999).
-
Test
area of granite tiles (10 July 1999).
-
Stone
is hung on West Side (7 Aug 1999).
-
Tower
scaffolding (28 Aug 1999).